Projects

Structural Project

State Highway 285 Bridge Replacement,
Denver, CO


Nature of Work:
Sound wall design, replacement structures, Mechanically Stabilized Earth (MSE) walls, block architectural retaining walls, detour phase plans, signing and striping plans, landscaping, and highway and road design.

Colorado Department of Transportation

Project Description:
JR Engineering was contracted by the Colorado Department of Transportation to provide civil engineering, structural engineering, landscape architecture, geotechnical services, traffic engineering, and construction surveying for the replacement of the Raleigh Street Bridge.

The replacement of the Raleigh Street Bridge included the design of a new three-span cast-in-place concrete slab bridge supported on drilled pier foundations. JR Engineering provided the recommendations for multiple phasing of demolition of the existing bridge and construction of the new bridge.

© 2005 Westrian Home Privacy Policy